GOBLINWORKSQUESTIONABLE ENGINEERING CO.
No license. No problem.
A SMALL EXERCISE IN STRUCTURAL OPTIMISM

A bridge too goblin.

Get the turnips across. Preferably above the river.

WORK ORDER № 048Turnip Creek crossing One cart. Twelve bolts. You.
Your browser needs Canvas to display this game.
TURNIP CREEK / 34 M DOWNAWAITING A BAD IDEA
✛ BOGSIDE → SOMEWHERE BETTERNOT TO CODE
Click a bay to brace it. Click again to remove.1 – 5 work too
THE ENTIRE TRAINING PROGRAM

You're the engineer.
That’s the first problem.

  1. 01
    Pick timber or iron.

    You have 12 bolts. Timber costs 2; stronger iron costs 3. A swap refunds the old truss.

  2. 02
    Click the five bridge bays.

    The road planks are free, but they won’t hold the cart alone. Trusses in adjacent bays help one another. The center carries more stress.

  3. 03
    Send it. Learn from the splash.

    Watch the load meters. Sustained overload breaks a bay. Rebuild instantly, with all your bolts and your design intact.

W / I material   1–5 build
SPACE test   Z undo   R rebuild
Click the same truss again, or right-click, to reclaim it.